HumanoidHub / Tracker
Humanoid robot production tracker
Source-backed status across 12 humanoid robot manufacturers, including units shipped where public, 2026 targets, key customers, and source freshness for every row.
Next step
Continue from production status to buying context
Use the tracker as the source-backed starting point, then verify manufacturer records, compare robots, or start a guided shortlist without treating unknown cells as estimates.
Manufacturer status table
Sorted by production stage, then alphabetically. Cells show "unknown" when a manufacturer has not published a verifiable number; HumanoidHub does not extrapolate.
| Manufacturer | Robot | Stage | Units shipped | 2026 target | Key customer | Source | Source date | Checked | Evidence |
|---|---|---|---|---|---|---|---|---|---|
| AgiBot | A2 | Mass production | unknown | unknown | unknown | AgiBot UK deployment update | Jun 30, 2026 | Aug 24, 2026 | Manufacturer source |
| UBTECH Robotics | Walker S series | Mass production | unknown | unknown | unknown | UBTECH company profile and 2025 results | Apr 21, 2026 | Aug 24, 2026 | Manufacturer source |
| 1X Technologies | 1X NEO | Production | unknown | Up to 10,000 robots/year factory capacity | unknown | 1X NEO Factory update | Apr 30, 2026 | Aug 24, 2026 | Manufacturer source |
| Agility Robotics | Digit | Production | unknown | unknown | Schaeffler, GXO, Toyota Motor Manufacturing Canada, Mercado Libre | Agility Robotics deployment and production update | Jun 24, 2026 | Aug 24, 2026 | Manufacturer source |
| Boston Dynamics | Atlas (Electric) | Production | unknown | unknown | Hyundai, Google DeepMind | Boston Dynamics Atlas production announcement | Jan 5, 2026 | Aug 24, 2026 | Manufacturer source |
| Figure | Figure 03 | Production | 350+ | unknown | unknown | Figure (April 29, 2026) | Apr 29, 2026 | Aug 24, 2026 | Manufacturer source |
| Fourier Intelligence | GR-1 | Production | unknown | unknown | unknown | Fourier GR-1 product brochure | May 15, 2025 | Aug 24, 2026 | Manufacturer source |
| Unitree Robotics | Unitree G1 | Production | unknown | unknown | unknown | Unitree G1 product page | Aug 24, 2026 | Aug 24, 2026 | Manufacturer statements |
| Apptronik | Apollo | Pilot | unknown | unknown | Mercedes-Benz | Apptronik and Mercedes-Benz agreement | Mar 15, 2024 | Aug 24, 2026 | Manufacturer source |
| Sanctuary AI | Phoenix | Pilot | unknown | unknown | unknown | Sanctuary AI Phoenix announcement | May 16, 2023 | Aug 24, 2026 | Manufacturer source |
| Kepler Robotics | Kepler Forerunner | Prototype | unknown | unknown | unknown | Kepler Forerunner product page | Aug 24, 2026 | Aug 24, 2026 | Manufacturer source |
| Tesla | Optimus | Prototype | unknown | Start of production planned before end of 2026 | unknown | Tesla 2025 annual report | Jan 28, 2026 | Aug 24, 2026 | Manufacturer statements |
Notes
AgiBot / A2. The manufacturer reports its 15,000th robot across the wider portfolio; that number is not presented as A2 units shipped.
UBTECH Robotics / Walker S series. UBTECH reports 1,079 full-size embodied humanoids in 2025 across its portfolio; the row does not attribute that volume to Walker S2.
1X Technologies / 1X NEO. Factory capacity is not a shipment count. Customer deliveries remain planned rather than reported as completed.
Agility Robotics / Digit. Agility reports RoboFab capacity of up to 10,000 units annually. Capacity is not a 2026 target or shipment count, so both remain unknown.
Boston Dynamics / Atlas (Electric). Manufacturer-published unit counts remain unknown.
Figure / Figure 03. Figure reports a demonstrated one-robot-per-hour production cycle; this is not presented as a 2026 shipment target.
Fourier Intelligence / GR-1. Shipment volume, 2026 target, and named customers remain unknown.
Unitree Robotics / Unitree G1. Unit shipment volume and named customers remain unknown because the reviewed manufacturer page does not publish them.
Apptronik / Apollo. The cited source supports Mercedes-Benz only; other customer claims are omitted from this row.
Tesla / Optimus. No shipment count or named external customer is published in the cited filing.
Methodology
- Freshness SLA: every source-backed row should be reviewed within 30 days. When any row exceeds the SLA, the page renders a stale-state banner.
- Source date vs. checked date: the source date records when the cited evidence was published or, for an undated live page, when its current state was observed. The checked date records HumanoidHub's latest review and never changes the age of the underlying evidence.
- Mass production: consistent multi-thousand unit annual run rate, multiple deployment markets, second-source parts available.
- Production: shipping commercial units at scale but unit volume not yet in the multi-thousands annually.
- Pilot: deploying with named partners; not yet generally available; small unit counts.
- Prototype: demonstrated platform but not yet in customer hands.
- Where a number is not manufacturer-published or third-party-verified, the cell is marked unknown rather than estimated.
- See something wrong or stale? Tell us. Corrections in this table land in the next review.
Evaluate production status by deployment use case
Production readiness matters most when it is matched to a real operating environment. Compare the canonical solution guides before shortlisting vendors.
Dig deeper
Browse the catalog or compare specs
Production status is one signal. Specs, pricing, and capability fit are the rest.